Closing soon

BPA Floor Scrubber RFP

Description: The contractor shall perform preventive maintenance during each visit to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with (iaw) commercial practices or manufacture s specification, if available, and shall be intended to maintain the equipment in safe and reliable operation condition until the next scheduled maintenance. The contractor shall prepare and submit a written report within two-business days of the scheduled maintenance. The report shall identify each equipment, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of the equipment. If repairs require work considered over and above routine maintenance work, the contractor shall notify the contracting office and designated mxs representative before proceeding with the repairs. See attached file.

Buyer
Air Mobility Command

Federal · IL, US

Released
Aug 14, 2026
Closes
Aug 31, 2026(14 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts