Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of but is not limited to: Stone Masonry Veneer Demo Ceilings and, Miscellaneous and Decorative Steel, Carpentry, Glu Lam Construction, Finish Carpentry, Casework, Solid Surface Fabrications, Countertops, FRP, insulation, Caulking, Flashing, Doors and Hardware, Storefront, Metal Stud Framing, Drywall, Painting, Acoustic Ceilings, Drywall Suspension Assemblies, Wood Ceilings, Floor Coverings, Resinous Flooring, Floor and Wall Tile, Interior Painting, Wall Covering, Signage, Fire Sprinkler, Plumbing, HVAC, Electrical, Communications, Fire Alarm, Food Service and Owner supplied contractor installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Library spirit shop renovation.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
Library spirit shop renovation.
AvailableRenovation of Bldg. 62 AC Shop.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Renovation of Bldg. 62 AC Shop.
AvailableDESIGN-BUILD: This is a design-build project to construct a new maintenance shop at airport.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
DESIGN-BUILD: This is a design-build project to construct a new maintenance shop at airport.
AvailableProject consists of Vermeer sign shop renovation of an existing 70' X 40' metal building to house the City's street signage facility. The work will include a new office space, new restroom / mechanical room, sign print area, and to renovate the existing shop area. Streets and Drainage Facility - this is also an interior renovation in an existing building, and the needs are to expand the existing breakroom and upgrade the conditioned air within the space. There is also an alternate for this location on replacing the existing overhead doors and adding some large industrial fans within the shop area of the facility.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
Project consists of Vermeer sign shop renovation of an existing 70' X 40' metal building to house the City's street signage facility. The work will include a new office space, new restroom / mechanical room, sign print area, and to renovate the existing shop area. Streets and Drainage Facility - this is also an interior renovation in an existing building, and the needs are to expand the existing breakroom and upgrade the conditioned air within the space. There is also an alternate for this location on replacing the existing overhead doors and adding some large industrial fans within the shop area of the facility.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis