CityCA
May 14, 2026
Closes
Aug 13, 2026
Basin D Sanitary Sewer Rehabilitation *Re-bid*
Scope of work includes: Spot and Segment Repairs (Open Cut): Replace 6-", 8", 10" and 12" sanitary sewer pipe with the same size polyvinyl chloride (PVC) sewer pipe, reconnect service laterals, and reconnect new PVC pipe to existing manholes. Spot and Segment Repairs (Sectional CIPP): Rehabilitate existing 6-inch, 8", 10" and 12" sanitary sewer pipe with cured in place pipe (CIPP), reinstate service laterals, and connect CIPP liner to existing manholes. Manhole Repairs: Rehabilitate manholes by lining; channel repair; and full replacement. Pre- and Post-installation CCTV Inspections. Monument Replacement. See outside link.