Suny Upstate Medical University
Higher EducationNY
Posted
Sep 30, 2026
Oct 22, 2026
Boston Scientific Transcarotid Product Portfolio RFP
Purchase of scientific transcarotid product portfolio. Contract term: 2/25/26 through 2/24/28.
Description: Sale of 1988 25'. Boston Whaler Frontier with 2-150 hp 2013 Mercury outboard engines, condition: fair. The boat is located in our south parking lot. Surplus property must be removed from its location within 30-days.
SpecialDistrict · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Suny Upstate Medical University
Higher EducationNY
Posted
Sep 30, 2026
Oct 22, 2026
Purchase of scientific transcarotid product portfolio. Contract term: 2/25/26 through 2/24/28.
Fraser Valley Regional District
CountyBC
Posted
Oct 8, 2026
Oct 28, 2026
The Fraser Valley Regional District is seeking proposals for the supply, installation, testing, and commissioning of an integrated ventilation system for the fire engine bay at Boston Bar Fire Hall 1.
Massachusetts Bay Transportation Authority
State AgencyMA
Posted
Oct 7, 2026
Nov 5, 2026
The space is approx., 6,000 SF and located within the basement of the concourse area. The space will serve train operators (40-60 employees) before and after shifts with quiet areas, bathroom facilities, common kitchen, and office areas. The program is to include space for terminal operations for employee check-in/out. The existing space is a below grade shell space with concrete, steel and CMU construction. Existing utilities and structure (to remain) are exposed in the space. The scope of work includes interfacing with existing structure and systems, including extending or adding MEP/FP systems as required.
Massachusetts Bay Transportation Authority
State AgencyMA
Posted
Oct 7, 2026
Nov 5, 2026
The space is approx., 6,000 SF and located within the basement of the concourse area. The space will serve train operators (40-60 employees) before and after shifts with quiet areas, bathroom facilities, common kitchen, and office areas. The program is to include space for terminal operations for employee check-in/out. The existing space is a below grade shell space with concrete, steel and CMU construction. Existing utilities and structure (to remain) are exposed in the space. The scope of work includes interfacing with existing structure and systems, including extending or adding MEP/FP systems as required.