CityWI
Posted
Oct 22, 2026
Dec 2, 2026
WTP Boiler Replacement RFP
Removal and replacement of the water treatment plant building boiler system and all associated appurtenances.
Description: Removal and replacement of, in kind, the two (2) existing Lockinvar Boiler Tanks. Work shall include all necessary piping and appurtenances to provide a functional system. The project shall also include maintaining continuous service during the replacement. In addition to the boiler tank work, the project will involve the installation of protective coating on existing PCC floor, existing drywall removal, replacement and painting. Two pre-bid meeting(s) will be conducted by the City Engineer at the job site on Tuesday, December 1, 2026 at 9:30 A.M., and Wednesday, December 9, 2026 at 9:30 A.M. All bidders are required to attend; it is mandatory to attend one of the pre-bid meetings. Attendees will meet at El Encanto Convalescent Hospital, maintenance area at 555 S. El Encanto Road. Please be advised access to mechanical room and the room itself will be from the outside only. For bidders who are not able to attend the scheduled job walks and desire to provide a bid, arrangements may be made by contacting the project manager at CNC Engineering, (626) 333-0336, to see the site. Job walks may be scheduled between 10 AM and 2 PM, Monday through Friday. The bidder shall allow 48 hour advance notice to allow for coordination and scheduling access to the site. Job walks requested in the last 72 hours prior to the bid time may not be possible but will be accommodated if possible.
City · CA, US
Adjacent opportunities open for bidding right now.
CityWI
Posted
Oct 22, 2026
Dec 2, 2026
Removal and replacement of the water treatment plant building boiler system and all associated appurtenances.
Southern University and A M College
Higher EducationLA
Posted
Oct 28, 2026
Dec 7, 2026
Provide boiler & pump replacement.
Special DistrictMA
Posted
Nov 25, 2026
Dec 28, 2026
Boiler replacement. Subtrades: plumbing, electrical.
School DistrictMI
Posted
Nov 18, 2026
Dec 4, 2026
Proposal A - Middle School at Ore Creek Boiler Replacement
Decision makers connected to this RFP from City of Industry.
Solicitation files and supporting documents for this bid.