Sewer Extension Redesign Gowen Service District CSP 1213
Work consists approx. 50 LF Removal of Concrete Foundations (if encountered); 1,385 LF Miscellaneous Surface Restoration (Natural Ground); 521 LF Type "C" Surface Restoration (Gravel Roadway); 2,292 LF Main Line Type "P" Surface Restoration (Asphalt Roadway); 2,449 LF Gravity Sewer Pipe - 8" PVC (includes excavation, bedding, backfill etc.); 777 LF Gravity Sewer Pipe - 10" PVC (includes excavation, bedding, backfill etc.); 2,976 LF CCTV Inpection - Size 8"; 1 EA Connection to Existing Manhole Size 18"; 3 EA Sewer Service Connection to Main - 4" Service to 10" Main; 1 LS Traffic Control.