Summary
Work consist of installation of 2765 LF of 4" PVC waterline by trenching. 1 LS mobilization; 1 LS clearing and grubbing; 1,844 SY solid slab sod; 5 EA 4" gate valve & box; 1 EA 2"x2" tapping sleeve & valve w/ box; 2 EA water service reconnection (short); 4 EA water service reconnection (long); 1 EA lead service replacement (short); 1 EA lead service replacement (long); 8 EA frost free hydrant assembly; 1 EA remove & reset water meter; 171 SY remove & replace asphalt pavement; 27 SY remove & replace concrete sidewalk; 11 SY remove & replace gravel; 1 LS construction signing and traffic control; 1 LS temporary erosion and sediment control; 1 LS pressure and leakage testing; 1 LS disinfection and testing. See attached file.