Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Charlotte is soliciting bids for the Blackmon Street Storm Drainage Improvement Project to reduce flooding and upgrade culverts and pipe systems within the project area bounded by Sampson Street, Hoskins Road, and Ridgeley Drive. The estimated project cost is approximately $4.39 million, and the work includes replacement of aging infrastructure and capacity improvements. A pre-bid was held on January 7, 2026, questions were due January 14, 2026, and bids are due January 27, 2026 at 10:00 AM EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Storm drainage improvement project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream.
Posted Date
Jan 20, 2026
Due Date
Feb 18, 2026
Release: Jan 20, 2026
Close: Feb 18, 2026
Storm drainage improvement project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream.
AvailableProject will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Project will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
AvailableProcurement of survey services for storm drainage improvements on Depot Street in Society Hill, SC.
Posted Date
Jan 21, 2026
Due Date
Feb 5, 2026
Release: Jan 21, 2026
Close: Feb 5, 2026
Procurement of survey services for storm drainage improvements on Depot Street in Society Hill, SC.
AvailableProvide preconstruction and construction services for the relocation of the existing pump station along with the proposed storm drainage work using the construction manager-at risk (CMAR) method of project delivery. Included in the scope of services is collaboration with the design engineer during the design phase, providing constructability and value engineering guidance, development of a guaranteed maximum price (GMP) proposal(s), and, assuming successful negotiation of a GMP(s) with the City, ultimately entering into a construction agreement for the construction of the Project.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Provide preconstruction and construction services for the relocation of the existing pump station along with the proposed storm drainage work using the construction manager-at risk (CMAR) method of project delivery. Included in the scope of services is collaboration with the design engineer during the design phase, providing constructability and value engineering guidance, development of a guaranteed maximum price (GMP) proposal(s), and, assuming successful negotiation of a GMP(s) with the City, ultimately entering into a construction agreement for the construction of the Project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis