Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Storm drainage improvement project involves removal of existing retaining wall and installation of erosion control measures; installation of a new retaining wall; milling, resurfacing, and restriping of existing parking lot; installation of wheelstops and installation of curb; installation of a stormwater manhole, catch basin, and associated pipe. Stream improvements include addition a boulder toe, rock sills, and plantings along portions of the stream.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Project will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
AvailableThe City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
The City of Miami Springs seeks a qualified contractor to construct the South Drive Stormwater and Roadway Improvement Project to provide water quality, stormwater management, and beautification along the South Drive corridor. The scope includes localized drainage, roadway geometry and landscape improvements, enhancements to roundabouts, and measures to accommodate pedestrian, cyclist, and motorist safety while reducing flooding. This opportunity is issued as an Invitation for Bid (ITB) and includes a mandatory pre-bid meeting; supporting bid documents are available on the original posting linked from the aggregator.
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
This project area is within a drainage area of approx 300 acres and the improvements will include culvert and pipe system upgrades.
Provide preconstruction and construction services for the relocation of the existing pump station along with the proposed storm drainage work using the construction manager-at risk (CMAR) method of project delivery. Included in the scope of services is collaboration with the design engineer during the design phase, providing constructability and value engineering guidance, development of a guaranteed maximum price (GMP) proposal(s), and, assuming successful negotiation of a GMP(s) with the City, ultimately entering into a construction agreement for the construction of the Project.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Provide preconstruction and construction services for the relocation of the existing pump station along with the proposed storm drainage work using the construction manager-at risk (CMAR) method of project delivery. Included in the scope of services is collaboration with the design engineer during the design phase, providing constructability and value engineering guidance, development of a guaranteed maximum price (GMP) proposal(s), and, assuming successful negotiation of a GMP(s) with the City, ultimately entering into a construction agreement for the construction of the Project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis