Summary
Provide survey, design, and right-of-way/easement services for approximately 15,800 of new concrete sidewalk. The project will also feature pedestrian crossings at existing intersections as well as potential mid-block crossings. Work will include ancillary items such as utility coordination, minor drainage modifications, and other items related to a sidewalk corridor project. Work include: sidewalk design and construction documents, including: topo and horizontal/physical survey of sidewalk corridor; deed/plat research and establishment of existing row and easement lines; sidewalk alignment and corridor design; drainage improvements to facilitate new sidewalk; traffic control plans; erosion and sediment control plans; pedestrian crossing design at signalized intersections.