Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Tulalip Tribes of Washington
Design for solar and battery storage & microgrid integration. Design a solar PV and battery storage system for the Betty Taylor Learning Academy and integrate this system with the Gathering Hall microgrid. The basis of this design solicitation seeks support for: Solar PV: Final design support for a 240kW-DC rooftop solar array, mounted on existing standing seam metal roof, southeast facing. Battery Energy Storage System: Coupled storage capacity with a minimum of 500kW-1320kWh storage potential that is integrated with the Tulalip Gathering Hall microgrid project, which will be completed in the fall of 2026. 1500kW Diesel Generator: Resilience support through planned interconnection with an existing 1500kW diesel generator to support the building in prolonged outages.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pittsburgh Public School District
Seeking solar energy developers for solar photovoltaic systems.
Posted Date
Nov 9, 2025
Due Date
Jan 13, 2026
Release: Nov 9, 2025
Pittsburgh Public School District
Close: Jan 13, 2026
Seeking solar energy developers for solar photovoltaic systems.
AvailableHazlet Township School District
Qualified providers to provide electric to be generated by a solar photovoltaic power system ("PV system") to be installed at Schools. The PV System being considered is a roof mounted system. The base scope for the PV System varies by school as follows: (1) for both of the Middle School and Elementary School, the base and alternate cases permit PV system installations without restrictions on roof sections, as long as the solar remains confined to the rooftop; and (2) for High School, the base case restricts the PV system to select roofing areas, while the alternate case proposes a roof-mounted system with no restrictions, all as more particularly provided in the RFP.
Posted Date
Oct 21, 2025
Due Date
Dec 2, 2025
Release: Oct 21, 2025
Hazlet Township School District
Close: Dec 2, 2025
Qualified providers to provide electric to be generated by a solar photovoltaic power system ("PV system") to be installed at Schools. The PV System being considered is a roof mounted system. The base scope for the PV System varies by school as follows: (1) for both of the Middle School and Elementary School, the base and alternate cases permit PV system installations without restrictions on roof sections, as long as the solar remains confined to the rooftop; and (2) for High School, the base case restricts the PV system to select roofing areas, while the alternate case proposes a roof-mounted system with no restrictions, all as more particularly provided in the RFP.
Mid-Coastside Sewer Authority
Sewer Authority Mid-Coastside seeks proposals for a Power Purchase Agreement for solar photovoltaic and/or solar + battery energy storage systems at its wastewater treatment facility in Half Moon Bay, CA. The project involves engineering, procurement, construction, and maintenance of the systems, with a focus on maximizing energy cost savings. Proposers must have experience with commercial solar installations and battery storage, particularly in California municipalities.
Posted Date
Nov 13, 2025
Due Date
Dec 8, 2025
Release: Nov 13, 2025
Mid-Coastside Sewer Authority
Close: Dec 8, 2025
Sewer Authority Mid-Coastside seeks proposals for a Power Purchase Agreement for solar photovoltaic and/or solar + battery energy storage systems at its wastewater treatment facility in Half Moon Bay, CA. The project involves engineering, procurement, construction, and maintenance of the systems, with a focus on maximizing energy cost savings. Proposers must have experience with commercial solar installations and battery storage, particularly in California municipalities.
AvailableBelmar Housing Authority
Provider of net-metering (community solar) credits, to help lower its electric costs.
Posted Date
Nov 3, 2025
Due Date
Dec 5, 2025
Release: Nov 3, 2025
Belmar Housing Authority
Close: Dec 5, 2025
Provider of net-metering (community solar) credits, to help lower its electric costs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis