Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project scope consists of the following Work: Analyzing the existing stormwater basin that discharges into the Wenatchee River and designing the stormwater system including treatment facilities, that will connect to existing facilities as required; Preparing/submitting/reviewing of roadway and stormwater concept(s) at 10% design including costs and risks associated with the concept(s); Preparing/ submitting/reviewing fill retaining wall type(s) such as gravity block/gabion baskets or structural earth walls (SEWs) at 10% design including costs and risks associated with the concept(s); Work with the County at 60% design completion to identify right of way and environmental impacts. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
Posted Date
Nov 17, 2025
Due Date
Jan 20, 2026
Release: Nov 17, 2025
Close: Jan 20, 2026
The County of Fairfax requests Statements of Qualifications from qualified engineering firms for the Magnolia Lane Capacity Improvements Project, covering planning, design, permitting, and construction-phase support to upsize approximately 3,492 linear feet of existing 8-inch and 10-inch gravity sewer to new 12-inch and 16-inch pipes. The procurement is managed through the county's Wastewater Design and Construction Division and seeks firms to support the project from planning through construction-phase services.
AvailableProvide construction management services and materials testing services including: resident engineer, construction engineering, construction inspection, material sampling and testing.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide construction management services and materials testing services including: resident engineer, construction engineering, construction inspection, material sampling and testing.
AvailableSoliciting Statements of Qualifications for Construction Manager at Risk (CMAR) services for the SR 347 road improvement project, which includes widening, intersection improvements, grade separation, pavement rehabilitation, and a traffic interchange between I-10 and the City of Maricopa.
Posted Date
Oct 31, 2025
Due Date
Dec 12, 2025
Release: Oct 31, 2025
Close: Dec 12, 2025
Soliciting Statements of Qualifications for Construction Manager at Risk (CMAR) services for the SR 347 road improvement project, which includes widening, intersection improvements, grade separation, pavement rehabilitation, and a traffic interchange between I-10 and the City of Maricopa.
Design, construct and equip the 2026 school district facilities improvements project.
Posted Date
Dec 2, 2025
Due Date
Dec 17, 2025
Release: Dec 2, 2025
Close: Dec 17, 2025
Design, construct and equip the 2026 school district facilities improvements project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis