Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes clearing and grubbing within right of way, removal and disposal item no 11, removal and disposal of existing pavement 487. 000 SY, unclassified excavation 1,019.000 CY, borrow excavation 7,586. 000 CY, fine grading 7,078.000 SY, flowable fill 35.000 CY, maintenance stone 270.000 Ton, liquid asphalt binder pg64-22 417.000 Ton, full depth asph pav patching 12" unif 100.000 SY, milling existing asphalt pavement 10.0" 43,067.000 SY, milling existing asphalt pavement (variable) 2,375.000 SY, asphalt base course - type b 2,127.000 Ton. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes : 487 CY removal & disposal of existing pavement; 1,019 CY unclassified excavation; 7,078 SY fine grading; 100 SY full depth asphalt pavement patching 12"unif; 43,067 SY milling existing asphalt pavement 10.0"; 2,375 SY milling existing asphalt pavement (variable); 432 SF permanent construction signs (ground mounted); see attached file.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work includes : 487 CY removal & disposal of existing pavement; 1,019 CY unclassified excavation; 7,078 SY fine grading; 100 SY full depth asphalt pavement patching 12"unif; 43,067 SY milling existing asphalt pavement 10.0"; 2,375 SY milling existing asphalt pavement (variable); 432 SF permanent construction signs (ground mounted); see attached file.
AvailableInstallation of village gateway signage, decorative corridor monument signage, wayfinding signage, pedestrian experience enhancements such as benches, bicycle racks, additional trees w/grates, and enhanced pedestrian crossings. In addition to this, the removal replacement of deteriorated miscellaneous curb, sidewalk, and driveways, along with the milling and resurfacing of certain intersections comprised of hot-mix asphalt pavements; pavement markings; landscaping restoration of disturbed areas, and other related work.
Posted Date
Dec 24, 2025
Due Date
Jan 14, 2026
Release: Dec 24, 2025
Close: Jan 14, 2026
Installation of village gateway signage, decorative corridor monument signage, wayfinding signage, pedestrian experience enhancements such as benches, bicycle racks, additional trees w/grates, and enhanced pedestrian crossings. In addition to this, the removal replacement of deteriorated miscellaneous curb, sidewalk, and driveways, along with the milling and resurfacing of certain intersections comprised of hot-mix asphalt pavements; pavement markings; landscaping restoration of disturbed areas, and other related work.
Training on Bicycle and Pedestrian Design Guidance and/or Safe Routes to School Planning.
Posted Date
Dec 12, 2025
Due Date
Jan 16, 2026
Release: Dec 12, 2025
Close: Jan 16, 2026
Training on Bicycle and Pedestrian Design Guidance and/or Safe Routes to School Planning.
AvailableThe work consist of approx 11,700 SY milling existing asphalt pavement; 2,150 LF 24" white solid lines pavement marking; 725 LF furnish and install 2.0" schedule 80 PVC conduit; 546 LF concrete curb and gutter; 850 SY pedestrian ramp construction.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
The work consist of approx 11,700 SY milling existing asphalt pavement; 2,150 LF 24" white solid lines pavement marking; 725 LF furnish and install 2.0" schedule 80 PVC conduit; 546 LF concrete curb and gutter; 850 SY pedestrian ramp construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis