Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of warehouse and lab, phase 1.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 1,760,000 SF greenfield food processing facility. Bid packages includes: contract 03.10 - concrete foundations; contract 23.52 - boiler package material procurement and installation; contract 23.73 - air handling unit material procurement and installation. See outside link.
Posted Date
Dec 16, 2025
Due Date
Jan 7, 2026
Release: Dec 16, 2025
Close: Jan 7, 2026
Work includes approx 1,760,000 SF greenfield food processing facility. Bid packages includes: contract 03.10 - concrete foundations; contract 23.52 - boiler package material procurement and installation; contract 23.73 - air handling unit material procurement and installation. See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Oklahoma State University Facilities Management, under the direction of the Board of Regents, is soliciting bids for the OCCC Mini Hospital Med project to install air, oxygen, and vacuum bed simulations. The primary package in this solicitation is Bid Package 1 – Plumbing, with a mandatory pre-bid on December 30, 2025 at OSU-OKC. Bids are due January 7, 2026 at 1:30 PM at Oklahoma City Community College, 7777 S May Ave, Oklahoma City, OK 73159.
Posted Date
Dec 14, 2025
Due Date
Jan 7, 2026
Release: Dec 14, 2025
Close: Jan 7, 2026
Oklahoma State University Facilities Management, under the direction of the Board of Regents, is soliciting bids for the OCCC Mini Hospital Med project to install air, oxygen, and vacuum bed simulations. The primary package in this solicitation is Bid Package 1 – Plumbing, with a mandatory pre-bid on December 30, 2025 at OSU-OKC. Bids are due January 7, 2026 at 1:30 PM at Oklahoma City Community College, 7777 S May Ave, Oklahoma City, OK 73159.
Security vestibules phase 3 project.
Posted Date
Nov 24, 2025
Due Date
Feb 25, 2026
Release: Nov 24, 2025
Close: Feb 25, 2026
Security vestibules phase 3 project.
AvailableWork includes 1 allowance gas main relocation utility support; 6 EA mbta electric manhole frame and cover adjustments; 198 EA external building inspection; 18 ea external building inspection; 1 LS erosion and sedimentation control; 4,000 TON disposal of construction debris as solid waste; 12,200 TON disposal of bituminous concrete; 58 EA demolition or removal of manhole, catch basin or other structure; 27 EA abandon-in-place manhole, catch basin or other structure; 20 CY abandon-in-place with cellular concrete - pipe 15" or larger; 1,427 LF demolition or removal of concrete brick pipe 15" to 24" dia. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Work includes 1 allowance gas main relocation utility support; 6 EA mbta electric manhole frame and cover adjustments; 198 EA external building inspection; 18 ea external building inspection; 1 LS erosion and sedimentation control; 4,000 TON disposal of construction debris as solid waste; 12,200 TON disposal of bituminous concrete; 58 EA demolition or removal of manhole, catch basin or other structure; 27 EA abandon-in-place manhole, catch basin or other structure; 20 CY abandon-in-place with cellular concrete - pipe 15" or larger; 1,427 LF demolition or removal of concrete brick pipe 15" to 24" dia. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →