CityCT
Posted
Aug 6, 2026
Sep 21, 2026
Interior Renovations Board of Education Central Office (Invitation to Bid)
Work includes Interior Renovations.
Description: The project consists of miscellaneous general construction and electrical renovations and upgrades Work includes seating and desk upgrades in presentation room at CHS; Cafeteria floor finish replacement with terrazzo at NEES; Corridor floor finish replacement at CHS; Interior stair rail replacement at NEES; Window replacement at CHS; Concrete curb and sidewalk repairs at DES; Main parking lot repaving at CHS; and Exterior Façade repairs at DES, VFES, TEMS, and VFMS.
SchoolDistrict · PA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Conestoga Valley School District.
Adjacent opportunities open for bidding right now.
CityCT
Posted
Aug 6, 2026
Sep 21, 2026
Work includes Interior Renovations.
CityCT
Posted
-
Sep 16, 2026
Work include remove and replace the living room bay window with two (2) double-hung units and one (1) fixed unit in the center. Carpentry, chimney/woodstove opening repair, ventilation & painting, exterior envelope / gutters,
Wisconsin Department of Administration
State AgencyWI
Posted
Aug 6, 2026
Sep 15, 2026
In general, the work consists of: adding a wall in the existing Flight Planning room to create an Office and adding a wall in the Upper Lobby to create a Storage room. Remove a wall separating the existing Library from the Simulation Devices room to create a larger, single Fitness room. Mechanical work includes adding a VAV along with adding and removing ductwork to accommodate the room changes. Electrical work includes adding and removing devices including light fixtures. New finishes are planned for each of the rooms including removal and replacement of the lay-in ceiling. Lowering and slight adjustment of several fire sprinkler heads is required to accommodate the new layout.
Fort Myers City Housing Authority
Special DistrictFL
Posted
Jul 9, 2026
Sep 17, 2026
Work inlcudes concrete repair and restoration, soffit and fascia repair and replacement, gutter and downspout repair and replacement, stucco repair and restoration, exterior painting, caulking and sealants, exterior electrical work.