Atlanta Speedway Airport - Hangar Site Development
Work includes 2,300 GL prime coat, 20 CY concrete gravity retaining wall 9031l 2, 70 SY stone dumped rip rap type 3 - 18 in. Thick, 1 LS demolition, 1 EA adjust existing sanitary manhole to grade, 11 ea concrete pipe bollards, including concrete, foundations, painted yellow, installed complete, 400 LF 4 inch sch 40 pvc electrical conduit with stub-ups and pull strings capped, 925 TN recycled asphaltic concrete, 12. 5mm, superpave including bituminous materials and hydrated lime. See attached file.