Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction improvements to the maintenance building at park. The scope of work includes, but is not limited to, the addition of interior square footage and storage areas to the existing shop within the maintenance building and a complete remodel and expansion of the administrative area of the maintenance building, as more specifically described herein and in the plans and drawings set forth in the project manual entitled bid 26023 barber park maintenance building expansion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes expansion and renovation of the existing water resources department building with the expansion addition consisting of approx. 5,900 SF and renovation to the existing 8,000 SF building.
Posted Date
Sep 8, 2025
Due Date
Jan 22, 2026
Release: Sep 8, 2025
Close: Jan 22, 2026
Work includes expansion and renovation of the existing water resources department building with the expansion addition consisting of approx. 5,900 SF and renovation to the existing 8,000 SF building.
AvailableConstruction firms regarding the new expansion of the existing mosquito control office with a 600 SF metal building addition on the south side of the structure.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Construction firms regarding the new expansion of the existing mosquito control office with a 600 SF metal building addition on the south side of the structure.
AvailablePublic works/engineering building expansion project.
Posted Date
Jan 5, 2026
Due Date
Jan 28, 2026
Release: Jan 5, 2026
Close: Jan 28, 2026
Public works/engineering building expansion project.
AvailableProposals are requested for CNG Fueling Building Expansion Construction.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Proposals are requested for CNG Fueling Building Expansion Construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis