Posted
Aug 5, 2026
Jan 28, 2027
Carpet and Tile Flooring, Stage Floor Finishing, Concrete Polishing, Grinding and Staining RFP
Provide carpet and tile flooring, stage floor finishing, concrete polishing, grinding and staining.
Description: The district seeks formal quotes to remove carpet and adhesive and polish concrete in 27 designated classrooms. The work covers approximately 20,593 square feet. The required finish is Level 3 High-Gloss Polished Concrete.
SchoolDistrict · MN, US
Decision makers connected to this RFP from Anoka-Hennepin Independent School District 11.
From the first pre-RFP signals to the published RFP and its files.
Meeting agenda
667 days before RFP
The district's Fit for the Future plan listed classroom renovations and additions at Blaine High School.
Classroom renovations and additions, cafeteria expansions, fitness center additions, front entrance expansions, front office expansions and security upgrades, removal of all portable classrooms. ● Andover High School ● Anoka High School ● Blaine High School ● Champlin Park High School ● Coon Rapids High School FIT FOR THE FUTURE $249 million voter-approved…
Anoka-Hennepin Independent School District No. 11 School Board Meeting and Public Hearing
Meeting agenda · Dec 9, 2024
Agenda packet
107 days before RFP
The School Board was asked to approve the district's proposed 10-year LTFM plan for deferred-maintenance replacement and repair projects.
DATE: 06/22/2026 CLASSIFICATION: Action AUTHORS: Greg Cole, Chief Operations Officer; Ben Martinson, Director of Buildings and Grounds SUBJECT: Fiscal Year 2028 LTFM 10-Year Plan for the Minnesota Department of Education PURPOSE: To seek school board approval for the 10-year Long Term Facilities Maintenance (LTFM) Plan. Annually, this plan is reviewed…
RFP published
Proposals due (Closed)
Anoka-Hennepin Independent School District No. 11 Regular School Board Meeting
Agenda packet · Jun 22, 2026
These related opportunities are still open for bidding.
Posted
Aug 5, 2026
Jan 28, 2027
Provide carpet and tile flooring, stage floor finishing, concrete polishing, grinding and staining.
Special DistrictWA
Posted
Oct 15, 2026
Nov 19, 2026
Retrofit the existing Terminal 4 (T4) pond stormwater treatment system by installing a permanent aboveground stormwater polishing system to treat runoff. Work includes: Installation of a lift station with two submersible pumps, valve vault, CIP concrete equipment pad, and aboveground polishing system; select fence demolition and re-installation; installation of water conveyance piping; excavation and open cut and trenchless trenching and dewatering; connection to existing stormwater infrastructure; site regrading and resurfacing; and electrical improvements.
Posted
Oct 2, 2026
Nov 16, 2026
Provide floor, aircraft NSN 1R-1560-015663336-V2, TDP VER 001, QTY 7 Ea
School DistrictMI
Posted
Oct 16, 2026
Nov 18, 2026
2027 Roofing Program.