School DistrictCA
Posted
Sep 10, 2026
Oct 21, 2026
CUPCCAA Bid No. C26-27-2 -- HMS Synthetic Field Turf Replacement
Replacement of synthetic field turf at Hawthorne Middle School.
Description: LAUSD is soliciting construction services to replace synthetic turf at Torres High School. The work is identified as “Synthetic Turf Replacement (BV) (PSA),” categorized as construction, and responses must cover the whole item. The open opportunity was posted September 30, 2026, and bids are due October 28, 2026, at 9:00 p.m. UTC.
SchoolDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
School DistrictCA
Posted
Sep 10, 2026
Oct 21, 2026
Replacement of synthetic field turf at Hawthorne Middle School.
Indigenous GovernmentMS
Posted
Sep 30, 2026
Oct 13, 2026
Work inlcudes installation of synthetic turf in the infield areas of the baseball and softball fields.
Cosumnes Community Services District
Special DistrictCA
Posted
Sep 24, 2026
Oct 15, 2026
Work consists of park synthetic turf replacement project. Includes removal and disposal of existing synthetic turf, base preparation and testing, installation of new synthetic turf with soccer and flag football markings, soccer goal footings and anchors, gmax testing, and an eight-year turf warranty includes base reconditioning & compaction; base drainage & porosity testing; additional aggregate base & reconstruction; installation of new 2" vertex prime coolplay synthetic turf system; inlaid 4" u9 soccer markings with nfl flag football overlay; concrete footings and anchor system for each soccer goal (6). See attached file.
Enterprise City School District
School DistrictAL
Posted
Sep 15, 2026
Oct 13, 2026
Work includes demolition of the existing turf, root zone, and field irrigation; subgrade improvement and grade correction; cast-in-place reinforced concrete header curb at the perimeter of both fields; perimeter underdrain and flat drain tied to the existing storm drainage system; stone subbase and turf buildup; synthetic turf and infill at the fields, bullpens, and batting cages; new field fencing and gates; and restoration of areas affected by construction access and laydown.
Decision makers connected to this RFP from Los Angeles Unified School District.