Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Relocation the existing 8" sanitary sewer main and 5 sanitary sewer manholes. The project includes the relocation of approx. 430 LF existing sewer main with the approx. 400 LF of 8" PVC C-900 sewer main. This project also includes the removal of 4 existing sanitary sewer manholes and the installation of 5 new sanitary sewer manholes. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for the installation of new 8-inch sanitary sewer main, 4-inch laterals with cleanouts, 4-foot diameter manholes, appurtenances, and restoration of disturbed areas.
Posted Date
Dec 11, 2025
Due Date
Jan 7, 2026
Release: Dec 11, 2025
Close: Jan 7, 2026
Procurement of services for the installation of new 8-inch sanitary sewer main, 4-inch laterals with cleanouts, 4-foot diameter manholes, appurtenances, and restoration of disturbed areas.
AvailableWork includes construction of the water, sanitary sewer, and drainage facilities & paving and appurtenances
Posted Date
Dec 2, 2025
Due Date
Dec 16, 2025
Release: Dec 2, 2025
Close: Dec 16, 2025
Work includes construction of the water, sanitary sewer, and drainage facilities & paving and appurtenances
AvailableThe City of Covington is soliciting bids for a sanitary sewer rehabilitation project including pipe bursting of approximately 1,740 feet of 8-inch sewer and 760 feet of 12-inch sewer, open-cut replacement of 8-inch sewer, replacement of about 55 laterals, reconnection of 5 laterals, and open-cut replacement of 20 manholes. Additional tasks include CCTV pre-lining, CIPP lining, external point repairs, trenchless cleanouts, and manhole rehabilitation; the work is to be performed in Covington, Virginia. The contract requires substantial completion within 240 calendar days and final completion/payment readiness within 270 calendar days.
Posted Date
Dec 5, 2025
Due Date
Dec 16, 2025
Release: Dec 5, 2025
Close: Dec 16, 2025
The City of Covington is soliciting bids for a sanitary sewer rehabilitation project including pipe bursting of approximately 1,740 feet of 8-inch sewer and 760 feet of 12-inch sewer, open-cut replacement of 8-inch sewer, replacement of about 55 laterals, reconnection of 5 laterals, and open-cut replacement of 20 manholes. Additional tasks include CCTV pre-lining, CIPP lining, external point repairs, trenchless cleanouts, and manhole rehabilitation; the work is to be performed in Covington, Virginia. The contract requires substantial completion within 240 calendar days and final completion/payment readiness within 270 calendar days.
Project consists of replacing in-kind of existing manholes, replacing in-kind of existing sanitary line, extension of existing stormwater line, and restoration work of the extensive erosion.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Project consists of replacing in-kind of existing manholes, replacing in-kind of existing sanitary line, extension of existing stormwater line, and restoration work of the extensive erosion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis