Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work is generally includes demolition and modification of the existing production well facility, modification of existing mechanical, piping, electrical, instrumentation, and control systems, installation of new yard piping (raw water, potable water, storm drain), electrical conduits, and instrumentation, installation of downhole control valves and new column piping, ancillary improvements in support of the foregoing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for the conversion of an existing drinking water production well at Beltz 8 into an aquifer storage and recovery (ASR) facility, including demolition, mechanical, piping, electrical, instrumentation, and control system modifications, and installation of new yard piping and downhole control valves.
Posted Date
-
Due Date
Jan 9, 2026
Close: Jan 9, 2026
Procurement for the conversion of an existing drinking water production well at Beltz 8 into an aquifer storage and recovery (ASR) facility, including demolition, mechanical, piping, electrical, instrumentation, and control system modifications, and installation of new yard piping and downhole control valves.
Premium
Access the largest public sector contact database
This project includes the installation of approximately one (1) Upper Floridan Aquifer Production Well, with a 18-inch diameter inner. The work as specified includes but is not limited to well drilling, casing, grouting, developing, capacity testing, geophysical and video logs, disinfection, wellhead finish, and site cleanup. The well should be capable of a flow rate of 600 gpm without causing excessive drawdown.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
This project includes the installation of approximately one (1) Upper Floridan Aquifer Production Well, with a 18-inch diameter inner. The work as specified includes but is not limited to well drilling, casing, grouting, developing, capacity testing, geophysical and video logs, disinfection, wellhead finish, and site cleanup. The well should be capable of a flow rate of 600 gpm without causing excessive drawdown.
AvailableFire house minor renovation project (bathroom upgrades).
Posted Date
Dec 9, 2025
Due Date
Dec 19, 2025
Release: Dec 9, 2025
Close: Dec 19, 2025
Fire house minor renovation project (bathroom upgrades).
AvailablePhase III Lighting LED Upgrades Project at Nine Schools.
Posted Date
Aug 20, 2025
Due Date
Dec 19, 2025
Release: Aug 20, 2025
Close: Dec 19, 2025
Phase III Lighting LED Upgrades Project at Nine Schools.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis