Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the installation of approximately one (1) Upper Floridan Aquifer Production Well, with a 18-inch diameter inner. The work as specified includes but is not limited to well drilling, casing, grouting, developing, capacity testing, geophysical and video logs, disinfection, wellhead finish, and site cleanup. The well should be capable of a flow rate of 600 gpm without causing excessive drawdown.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Construction of a 1 million gallon composite-style elevated water storage tank, control building, and associated appurtenances.
AvailablePremium
Access the largest public sector contact database
Project includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Project includes Contract A - Elevated Storage Tank Work (Lump Sum). Work for Contract A consists of construction of a 500,000-gallon single pedestal spheroid elevated storage tank, site work, and associated work.
AvailableRelease: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableThe work includes surface preparation, corrosion repair, and coating of metal surfaces of the City of Cocoa 1.5 MG Elevated Water Storage Tank. The Contractor scope of work also includes rehabilitation of tank equipment such as vents, ladders, and structural supports
Posted Date
Nov 10, 2025
Due Date
Dec 19, 2025
Release: Nov 10, 2025
Close: Dec 19, 2025
The work includes surface preparation, corrosion repair, and coating of metal surfaces of the City of Cocoa 1.5 MG Elevated Water Storage Tank. The Contractor scope of work also includes rehabilitation of tank equipment such as vents, ladders, and structural supports
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis