Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the conversion of an existing drinking water production well at Beltz 8 into an aquifer storage and recovery (ASR) facility, including demolition, mechanical, piping, electrical, instrumentation, and control system modifications, and installation of new yard piping and downhole control valves.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work is generally includes demolition and modification of the existing production well facility, modification of existing mechanical, piping, electrical, instrumentation, and control systems, installation of new yard piping (raw water, potable water, storm drain), electrical conduits, and instrumentation, installation of downhole control valves and new column piping, ancillary improvements in support of the foregoing.
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Work is generally includes demolition and modification of the existing production well facility, modification of existing mechanical, piping, electrical, instrumentation, and control systems, installation of new yard piping (raw water, potable water, storm drain), electrical conduits, and instrumentation, installation of downhole control valves and new column piping, ancillary improvements in support of the foregoing.
Premium
Access the largest public sector contact database
Work includes: providing fixed-price wrecker and impoundment services for police operations, including towing, recovery, transport, storage, release processing, and related support as required by the contract documents, along with any associated supplies or services necessary to deliver a complete, compliant service.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Work includes: providing fixed-price wrecker and impoundment services for police operations, including towing, recovery, transport, storage, release processing, and related support as required by the contract documents, along with any associated supplies or services necessary to deliver a complete, compliant service.
AvailableThe Commonwealth of Pennsylvania Office of General Counsel is soliciting a vendor-hosted SaaS case management solution capable of vendor-cloud document storage, AI features, disaster recovery, and change management. The selected vendor must provide implementation, data migration, training, maintenance, support, and comply with accessibility and security requirements. The procurement requires a technical submittal, cost proposal, and evidence of financial capability and relevant experience.
Posted Date
Oct 24, 2025
Due Date
Dec 12, 2025
Release: Oct 24, 2025
Close: Dec 12, 2025
The Commonwealth of Pennsylvania Office of General Counsel is soliciting a vendor-hosted SaaS case management solution capable of vendor-cloud document storage, AI features, disaster recovery, and change management. The selected vendor must provide implementation, data migration, training, maintenance, support, and comply with accessibility and security requirements. The procurement requires a technical submittal, cost proposal, and evidence of financial capability and relevant experience.
Provide motor pool fuel tank replacement. Remove the existing uconn motor pool fueling station, and deliver a fully operational fueling system comprised of two (2) 10,000 gallon underground storage tanks (USTs), one for gasoline and the other for diesel, associated piping, leak detection, stage i vapor recovery, electrical and controls, integration with current usage monitoring system, civil/site restoration, and turnover training.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Provide motor pool fuel tank replacement. Remove the existing uconn motor pool fueling station, and deliver a fully operational fueling system comprised of two (2) 10,000 gallon underground storage tanks (USTs), one for gasoline and the other for diesel, associated piping, leak detection, stage i vapor recovery, electrical and controls, integration with current usage monitoring system, civil/site restoration, and turnover training.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis