Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes swale cleaning and grading, pipes, trench drains, drainage structures and required pavement restoration, milling and overlay and maintenance and protection of traffic.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD. Seeking qualified design build firms for the garcia creek drainage improvements. The project generally includes creek channel stabilization, erosion control, structural improvements, and related drainage infrastructure within the city. Placement of rock riprap and construction of rock check dams. Construction of concrete drop structures and a stilling basin.
Posted Date
Jan 21, 2026
Due Date
Mar 2, 2026
Release: Jan 21, 2026
Close: Mar 2, 2026
DESIGN-BUILD. Seeking qualified design build firms for the garcia creek drainage improvements. The project generally includes creek channel stabilization, erosion control, structural improvements, and related drainage infrastructure within the city. Placement of rock riprap and construction of rock check dams. Construction of concrete drop structures and a stilling basin.
AvailableWork includes removal of architectural barriers, construction of ADA accessible parking area, an ADA accessible walking trail, drainage, signing and striping and required restoration.
Posted Date
Jan 28, 2026
Due Date
Feb 26, 2026
Release: Jan 28, 2026
Close: Feb 26, 2026
Work includes removal of architectural barriers, construction of ADA accessible parking area, an ADA accessible walking trail, drainage, signing and striping and required restoration.
AvailableDrainage improvements, including installation of inlets, pipes, curb, performed scour hole, concrete headwall and pavement repairs.
Posted Date
Nov 29, 2025
Due Date
Feb 3, 2026
Release: Nov 29, 2025
Close: Feb 3, 2026
Drainage improvements, including installation of inlets, pipes, curb, performed scour hole, concrete headwall and pavement repairs.
AvailableStormwater and roadway improvements. A bid alternate is included for pavement repairs.
Posted Date
Sep 19, 2025
Due Date
Feb 26, 2026
Release: Sep 19, 2025
Close: Feb 26, 2026
Stormwater and roadway improvements. A bid alternate is included for pavement repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →