Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bear Creek Lakes Civic Association is soliciting bids to completely rebuild its approximately 60-year-old community swimming pool, including pool shell reconstruction, ADA improvements, and mechanical upgrades. Construction is scheduled to begin in September 2026 and must be completed by mid-April 2027 to avoid interrupting community use. Bidders must have prior experience with community-sized pool construction and submit their proposals through the PennBid portal by March 1, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contractors to rebuild its 60-year-old swimming pool. Bidding contractors must have prior experience in community sized swimming pool construction.
Posted Date
Jan 30, 2026
Due Date
Mar 2, 2026
Release: Jan 30, 2026
Close: Mar 2, 2026
Contractors to rebuild its 60-year-old swimming pool. Bidding contractors must have prior experience in community sized swimming pool construction.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide and deliver swimming pool chemicals on an as needed basis to five (5) locations.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Provide and deliver swimming pool chemicals on an as needed basis to five (5) locations.
AvailableWork includes install new slip resistant contrasting step tile on pool steps per state code; replace all perimeter waterline tiles with new ceramic/porcelain or clay tile with national pool trends (npt) tile, color atl-blue (blue); atlantis line, or equivalent; replace 6" x 6" tiles with 6" x 6" tiles, 2" x 2" tiles with 2" x 2" tiles and the mud cap tiles around gutter system and steps with 2" x 6" nonslip tile; tile needs to be grouted with pro spec antique white 03 or equivalent; inspect and repair coping stones or replace as directed; reseal all expansion and control joints with pool-grade elastomeric sealant. See outside link.
Posted Date
Dec 7, 2025
Due Date
Aug 1, 2026
Release: Dec 7, 2025
Close: Aug 1, 2026
Work includes install new slip resistant contrasting step tile on pool steps per state code; replace all perimeter waterline tiles with new ceramic/porcelain or clay tile with national pool trends (npt) tile, color atl-blue (blue); atlantis line, or equivalent; replace 6" x 6" tiles with 6" x 6" tiles, 2" x 2" tiles with 2" x 2" tiles and the mud cap tiles around gutter system and steps with 2" x 6" nonslip tile; tile needs to be grouted with pro spec antique white 03 or equivalent; inspect and repair coping stones or replace as directed; reseal all expansion and control joints with pool-grade elastomeric sealant. See outside link.
AvailableConstruction of new aquatic facility including a new seasonal pool house, outdoor swimming pool, pool deck, pool slide, water features, pool accessories, fencing, sidewalk, parking lot, utilities, and landscaping.
Posted Date
Dec 22, 2025
Due Date
Feb 10, 2026
Release: Dec 22, 2025
Close: Feb 10, 2026
Construction of new aquatic facility including a new seasonal pool house, outdoor swimming pool, pool deck, pool slide, water features, pool accessories, fencing, sidewalk, parking lot, utilities, and landscaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →