Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the existing aeration blowers and associated piping, existing equipment pad demolition, new concrete equipment pad installations, and associated electrical work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the replacement of existing aeration blowers, associated piping, equipment pad demolition, new concrete equipment pad installations, and associated electrical work.
Posted Date
Nov 4, 2025
Due Date
Dec 16, 2025
Release: Nov 4, 2025
Close: Dec 16, 2025
Procurement for the replacement of existing aeration blowers, associated piping, equipment pad demolition, new concrete equipment pad installations, and associated electrical work.
AvailablePremium
Access the largest public sector contact database
Demolishing 3 fine screens and 2 screw conveyors and installing 3 new owner-furnished fine screens with control panels and 2 owner-furnished screw conveyors, demolishing 3 aeration blowers and installing 3 owner-furnished turbo blowers and an owner-furnished control panel, demolishing an engine generator along with its transfer switch and fuel tank and installing an owner-furnished generator and owner-furnished transfer switches, provide 2 new noncontact flow meters, provide new controls.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Demolishing 3 fine screens and 2 screw conveyors and installing 3 new owner-furnished fine screens with control panels and 2 owner-furnished screw conveyors, demolishing 3 aeration blowers and installing 3 owner-furnished turbo blowers and an owner-furnished control panel, demolishing an engine generator along with its transfer switch and fuel tank and installing an owner-furnished generator and owner-furnished transfer switches, provide 2 new noncontact flow meters, provide new controls.
AvailableThe existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
The existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
AvailableProvide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis