Special DistrictIL
Jul 6, 2026
Closes
Aug 24, 2026
Administration Building: Lab and Office Renovation
Work consists of building renovation.
Description: Lab renovation is within an existing hospital building including 1) the demolition of the existing physical therapy area and the construction of a new laboratory and 2) the demolition of the existing laboratory area and the construction of the new physical therapy area. Minor electrical and plumbing work will be included as incidental to the limited architectural scope of work. Exterior building improvement so r site work is not included as part of the project. Interior materials include but are not limited to painted gypsum board walls and ceilings, acoustical ceiling tiles, sheet vinyl, luxury vinyl tile, rubber floor, and base, wall coverings, and millwork. Mechanical, plumbing, and electrical systems to accommodate scope of work.
SpecialDistrict · LA, US
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
Special DistrictIL
Jul 6, 2026
Closes
Aug 24, 2026
Work consists of building renovation.
Alabama Community College System
Higher EducationAL
Jun 10, 2026
Closes
Nov 12, 2026
Project consists of borom simulation lab renovation.
Cleveland Metropolitan School District
School DistrictOH
Aug 10, 2026
Closes
Sep 9, 2026
Cleveland Metropolitan School District is soliciting sealed bids for the renovation of two existing art classrooms and two offices at John F. Kennedy High School into a modern welding and fabrication laboratory. The project supports the district’s Career and Technical Education metallurgy pathway and includes architectural, structural, mechanical, and plumbing renovations. The ITB was released August 10, 2026, bids are due September 9, 2026 at 2:00 p.m. Eastern Time, and the posting identifies it as a sealed capital-project bid rather than a grant program.
Higher EducationNY
-
Closes
Aug 27, 2026
The project includes the interior renovation of Cornell University's Rhodes Hall B50 Laboratory, located in the Rhodes Hall basement. The scope includes temporary partitions and egress protection, selective demolition, new finishes, a non-rated gate and framed support, speed rails, and a net curtain and track. It also includes limited mechanical work and electrical adjustments, including power-distribution changes and transformer relocation, with an estimated construction budget of $225,000-$230,000.
Procurement and program contacts connected to West St Mary Parish Port Harbor And Terminal District.