Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installations of the foundations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes 49 "for rent" two-story, single family cottages on roughly 9.25 AC. Cottages are wood-frame construction. Ancillary structures on the property will include two (2) mail kiosks. All will have attached 2-car garages. See outside link.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Project includes 49 "for rent" two-story, single family cottages on roughly 9.25 AC. Cottages are wood-frame construction. Ancillary structures on the property will include two (2) mail kiosks. All will have attached 2-car garages. See outside link.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes frost wall foundation excavation and backfill 5 ea, crawl space rigid foam board and radon pipe 2800 sf, 6' concrete porch piers 15 ea, crane support (gravel pads and tempoary roadway) 1 ls, rock excavation 10 cy, boulder excavation 25 cy, stone embankment-in-place 100 cy, exploratory excavation 3 ea, common fill 500 cy, fine crushed stone (nhdot 304. 4) 150 cy, coarse crushed stone (nhdot 304. 5) 250 cy, sawed bituminous pavement 30 lf, hbp-3/4" binder mix, machine method 80 ton, hbp-1/2" surface mix, machine method 60 ton, pavement joint adhesive 500 lf, asphalt emulsion for tack coat 50 gal.
Posted Date
Jan 7, 2026
Due Date
Jan 20, 2026
Release: Jan 7, 2026
Close: Jan 20, 2026
Work includes frost wall foundation excavation and backfill 5 ea, crawl space rigid foam board and radon pipe 2800 sf, 6' concrete porch piers 15 ea, crane support (gravel pads and tempoary roadway) 1 ls, rock excavation 10 cy, boulder excavation 25 cy, stone embankment-in-place 100 cy, exploratory excavation 3 ea, common fill 500 cy, fine crushed stone (nhdot 304. 4) 150 cy, coarse crushed stone (nhdot 304. 5) 250 cy, sawed bituminous pavement 30 lf, hbp-3/4" binder mix, machine method 80 ton, hbp-1/2" surface mix, machine method 60 ton, pavement joint adhesive 500 lf, asphalt emulsion for tack coat 50 gal.
AvailableWork includes add or improve cabins, cottages and other lodging facilities at any state park within the state park system. The objectives in soliciting information are to promote the state parks mission, achieve proper balance of preservation and utilization of state parks properties while becoming more financially self-sustaining, and better serve the needs of citizens and of visitors to state through collaboration utilizing public private partnerships.
Posted Date
Oct 28, 2025
Due Date
Jan 30, 2026
Release: Oct 28, 2025
Close: Jan 30, 2026
Work includes add or improve cabins, cottages and other lodging facilities at any state park within the state park system. The objectives in soliciting information are to promote the state parks mission, achieve proper balance of preservation and utilization of state parks properties while becoming more financially self-sustaining, and better serve the needs of citizens and of visitors to state through collaboration utilizing public private partnerships.
AvailableSealed bids to purchase multiple surplus vacant land parcels owned by Socorro Independent School District in El Paso (Sandy Creek, Eastview Cottages, and Vista Del Sol lots). Bidders must submit completed bid forms (Exhibits A1–A9 as applicable), W-9, CIQ, and accept a 30-year restrictive covenant prohibiting K–12 use by non‑District entities.
Posted Date
Jun 19, 2025
Due Date
Jan 15, 2026
Release: Jun 19, 2025
Close: Jan 15, 2026
Sealed bids to purchase multiple surplus vacant land parcels owned by Socorro Independent School District in El Paso (Sandy Creek, Eastview Cottages, and Vista Del Sol lots). Bidders must submit completed bid forms (Exhibits A1–A9 as applicable), W-9, CIQ, and accept a 30-year restrictive covenant prohibiting K–12 use by non‑District entities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →