Summary
Clear and grub project site (approx. , 130' by 170'). Connect new water storage structure to existing water distribution system. Construct 60'x60' chain link security perimeter fencing around new tower location. Provide gravel access drive and parking to new water storage structure. Provide new water storage structure with supervisory control. Final grading and site restoration of all locations disturbed by construction activities. Complete demolition and removal of existing water storage structures: one (1) 40,000- gallon single pedestal elevated water storage tank. One (1) 75,000 - gallon single pedestal elevated water storage tank. Final grading and site restoration of all locations disturbed by demolition activities.