Summary
Within the existing laundry room and existing mail room, demolish the interior finishes including all built in cabinetry, dryer exhaust ductwork and chases, porcelain tile flooring, walls and door surrounding existing mail room, acoustical drop ceilings, and architectural flourishes surrounding window and door frames. Demolish the windows separating the laundry room from the corridor, demolish the existing door and frame to the corridor, and prepare the wall for the new door location. Demolish the window and the portion of the exterior wall at and prepare the opening for the new door. Within the existing game room, demolish the interior partition wall separating the space from the existing bulk storage room. Demolish all architectural flourishes surrounding window and door frames within the existing game room and within the corridor at the entrance to the existing game room. Demolish acoustical drop ceilings, flooring, and cove base within the existing game room. Demolish and cap hvac ductwork. See attached file.