Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District FT Worth
B6413 Building Renovation Secure Space.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Bossier City
Building Renovation.
Posted Date
Nov 20, 2025
Due Date
Dec 10, 2025
Release: Nov 20, 2025
City of Bossier City
Close: Dec 10, 2025
Building Renovation.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Great Lakes and Ohio River Division
The project includes construction of 4 floors at the high-bay area in facility 20145 by providing three additional separate elevated floors (Total 17,941 SF) above the existing basement floor. These spaces will create additional secure laboratory space within the building envelope of the high bay existing footprint. Additionally, a renovation shall include 9,666 SF of existing space.
Posted Date
Nov 15, 2024
Due Date
Dec 6, 2025
Release: Nov 15, 2024
Great Lakes and Ohio River Division
Close: Dec 6, 2025
The project includes construction of 4 floors at the high-bay area in facility 20145 by providing three additional separate elevated floors (Total 17,941 SF) above the existing basement floor. These spaces will create additional secure laboratory space within the building envelope of the high bay existing footprint. Additionally, a renovation shall include 9,666 SF of existing space.
AvailableCalifornia Department of General Services
The California Department of General Services is soliciting an ATM operator to install, maintain, and operate an ATM in a 10-square-foot space near the cafeteria of the California Natural Resources Building in downtown Sacramento. The operator must provide customer service, maintain the ATM in good condition, ensure accessibility during specified hours, and comply with applicable laws; documentation is available at the official buyer posting.
Posted Date
Oct 28, 2025
Due Date
Dec 31, 2025
Release: Oct 28, 2025
California Department of General Services
Close: Dec 31, 2025
The California Department of General Services is soliciting an ATM operator to install, maintain, and operate an ATM in a 10-square-foot space near the cafeteria of the California Natural Resources Building in downtown Sacramento. The operator must provide customer service, maintain the ATM in good condition, ensure accessibility during specified hours, and comply with applicable laws; documentation is available at the official buyer posting.
AvailableWestfield Gas & Electric
Performing interior renovations to their existing facility. The renovation consists of the installation of new office and warehouse space which will include complete fit-out of a newly constructed steel framed pre-engineered building ADA bathrooms, storage area and all site development work including earthwork and site improvements.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
Westfield Gas & Electric
Close: Dec 10, 2025
Performing interior renovations to their existing facility. The renovation consists of the installation of new office and warehouse space which will include complete fit-out of a newly constructed steel framed pre-engineered building ADA bathrooms, storage area and all site development work including earthwork and site improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →