Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of the Air Force seeks contractors to purchase and install 40 hinged HVAC chase doors at Shaw Air Force Base, South Carolina, under solicitation FA480326R0002. This firm fixed-price, competitive small business set-aside acquisition requires the installation of 16-gauge steel doors with associated drywall and framing work. Proposals are due by February 16, 2026, with a mandatory site visit scheduled for January 27, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This scope of work covers the purchase and the installation of new hinged HVAC chase doors. Contractor to prep and paint wall opening. Contractor to correct gypsum wall damaged. See Attachment 01. Current Wall Paint – Sherwin Williams – WS 7015 Repose Gray; Contractor is responsible for ensuring the paint color matches existing color. Install new hinged HVAC chase panel in each suite. See attached file.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
This scope of work covers the purchase and the installation of new hinged HVAC chase doors. Contractor to prep and paint wall opening. Contractor to correct gypsum wall damaged. See Attachment 01. Current Wall Paint – Sherwin Williams – WS 7015 Repose Gray; Contractor is responsible for ensuring the paint color matches existing color. Install new hinged HVAC chase panel in each suite. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide and install two (2) new rolling steel doors.
Posted Date
Jan 20, 2026
Due Date
Mar 2, 2026
Release: Jan 20, 2026
Close: Mar 2, 2026
Provide and install two (2) new rolling steel doors.
AvailableWork includes to design and install new HVAC systems that will include chilled water cooling.
Posted Date
Jul 29, 2025
Due Date
Apr 2, 2026
Release: Jul 29, 2025
Close: Apr 2, 2026
Work includes to design and install new HVAC systems that will include chilled water cooling.
AvailableProvide housing development with the goods, and services required to install hvac and upgrade electrical to 125-amp service in four 3br units.
Posted Date
Jan 10, 2026
Due Date
Feb 12, 2026
Release: Jan 10, 2026
Close: Feb 12, 2026
Provide housing development with the goods, and services required to install hvac and upgrade electrical to 125-amp service in four 3br units.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →