Closing soon

B. Everett Jordan Concrete Pad Installation - (Request for Quotation)

Description: Furnish all labor, materials, and equipment necessary to install a 24’-10” x 34’-4” concrete pad with column foundations for a prefabricated shelter. Site Preparation & Earthwork: Excavation: The site is a former construction staging area with soil consisting of heavily compacted mineral and rocky fill. The contractor shall utilize appropriate excavation equipment to remove all organic and inorganic material from the proposed slab area. Excavated material shall be removed and disposed of offsite at an approved facility. The contractor is highly encouraged to use excavation/ground protection matting to protect the existing turf in the park facility. If any damage occurs to property, it will be repaired by the contractor at the contractor’s expense as described in Section 1.9 – Damage Responsibility. Excavated area shall be compacted to 95% Proctor density with a heavy mechanical plate compactor prior to subbase installation. See attached file.

Released
Sep 28, 2026
Closes
Oct 28, 2026(14 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts