CityMB
Jul 20, 2026
Closes
Aug 18, 2026
533-2026 - Louise Bridge Substructure Rehabilitation and Riverbank Stabilization Works
The City of Winnipeg is soliciting bids for substructure rehabilitation and riverbank stabilization works on the Louise Bridge. The project involves structural pier rehabilitation, riverbank stabilization, underwater riprap placement, and the installation of bridge bearings. The work is divided into two parts, with Part 2 contingent upon the City obtaining legal access to private property, and key tasks include the installation of micro-piles, sheet piling, and reinforced concrete base slabs.