Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install ofci vertical turbine pump, install ofci 100 hp, 2300 v, 3-phase motor, install ofci flow meter, flow converter, electrical demolition, medium voltage mcc modifications and testing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
One (1) New Unused Aurora Pump Direct Replacement High Pressure Plant Water Pump # 2. Aurora Pump 411 2x2.5-10. Parts per Serial Number 20-2591004-2. This is a direct replacement. No piping changes required, No modifications. Direct drop-in replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
One (1) New Unused Aurora Pump Direct Replacement High Pressure Plant Water Pump # 2. Aurora Pump 411 2x2.5-10. Parts per Serial Number 20-2591004-2. This is a direct replacement. No piping changes required, No modifications. Direct drop-in replacement.
Premium
Access the largest public sector contact database
Fuel pump replacement project.
Posted Date
Nov 30, 2025
Due Date
Dec 15, 2025
Release: Nov 30, 2025
Close: Dec 15, 2025
Fuel pump replacement project.
AvailableEquipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailableWork includes furnish and install three (3) submersible pumps. Provide single source coordination responsibility through the pump manufacturer for the entire system including but not limited to the following: pumps, motors, accessories, testing, installation, cleaning, training commissioning, maintenance, and all other services as required.
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Work includes furnish and install three (3) submersible pumps. Provide single source coordination responsibility through the pump manufacturer for the entire system including but not limited to the following: pumps, motors, accessories, testing, installation, cleaning, training commissioning, maintenance, and all other services as required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.