Summary
The demolition of existing site features to include, but not limited to, the existing natural grass fields, fencing, and other appurtenances as detailed in the contract documents. The construction of a multi-purpose grass field, including the installation of a subsurface drainage system, infield clay for two fields, pedestrian walkways, and other appurtenances, as detailed in the contract documents. Various site improvements to include landscaping, walkways, fencing, and all other requirements, as detailed in the contract documents. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 5. Providing and restoring, where appropriate, all temporary facilities. 6. All other work indicated on the contract plans and/or specifications.