Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consists of the replacement of approx. 6,000 LF of 8" and 12" waterline and approx. 5,700 LF of 8" wastewater pipe. Also includes 20,041 SY of surface milling; 708 SY of hot mix asphaltic concrete pavement, 3", type C; 19,333 SY of hot mix asphaltic concrete pavement, 2" type D; 144 LF of encasement pipe 16" dia. type 3/8" steel; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Perform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
AvailableOperations pipeline rehabilitation program
Posted Date
Nov 3, 2025
Due Date
Jan 9, 2026
Release: Nov 3, 2025
Close: Jan 9, 2026
Operations pipeline rehabilitation program
AvailableRehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Rehabilitation of wastewater gravity pipelines utilizing cured-in-place pipe and manhole rehabilitation.
AvailableWork includes the installation of approx. 18,500' of water reuse pipelines from the city wastewater treatment plant, sizes ranging from 6" to 12". In addition to the water reuse pipeline, this project also includes the reconfiguration of the mall entrance drives, by closing in certain entrances as shown in the plans. 1 ls mobilization (not to exceed 3% of total bid), complete in place, the sum of; 1 ls traffic control and regulation, complete in place, the sum of; 1 ls critical investigation work (includes locating existing underground utilities and pipelines as needed to facilitate water line construction), complete in place, the sum of; 52 ea inlet protection barrier, complete in place, the sum of. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Release: Dec 19, 2025
Close: Jan 15, 2026
Work includes the installation of approx. 18,500' of water reuse pipelines from the city wastewater treatment plant, sizes ranging from 6" to 12". In addition to the water reuse pipeline, this project also includes the reconfiguration of the mall entrance drives, by closing in certain entrances as shown in the plans. 1 ls mobilization (not to exceed 3% of total bid), complete in place, the sum of; 1 ls traffic control and regulation, complete in place, the sum of; 1 ls critical investigation work (includes locating existing underground utilities and pipelines as needed to facilitate water line construction), complete in place, the sum of; 52 ea inlet protection barrier, complete in place, the sum of. See attached file.