Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide asphalt services for pavement maintenance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Asphalt pavement and& stone dust materials.
Posted Date
Dec 5, 2025
Due Date
Dec 17, 2025
Release: Dec 5, 2025
Close: Dec 17, 2025
Asphalt pavement and& stone dust materials.
AvailablePremium
Access the largest public sector contact database
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
AvailableThe general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.
Posted Date
Oct 17, 2025
Due Date
Jan 13, 2026
Release: Oct 17, 2025
Close: Jan 13, 2026
The general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.
AvailablePavement preventative maintenance.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Pavement preventative maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis