2027 Citywide Concrete Repairs and Intersection Ramps Project RFP
29,010 SF of Remove and Reconstruct Sidewalk (4" thick); 474 SF of Remove and Reconstruct Sidewalk and Driveway (6" thick); 9,636 LF of Remove and Reconstruct Curb and Gutter; 3,813 SF of Remove Concrete (Park Strip and Other Misc.); 4 EA of Remove Concrete and Install Curb Ramp (Case A); 2,495 SF of Remove and Replace Valley Gutter; 14,189 SF of Remove and Replace Asphalt Paving (6" deep); 37 EA of Remove Tree (Trunk Diameter <18"); 100 SF of Remove Surface Roots; 79 EA of Furnish and Install Street Trees (15-gal.) Various Species; 10 EA of Relocate Stop Bar, Legend, and Striping (Paint); 100 SF of Additional Pavement Markings (Paint).