Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide asphalt and tack oil to be laid in place at a cost per ton on various roads within the county.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Supply and delivery of 2026 season's requirements of asphalt emulsion ss1h (tack). The estimated quantity required is 10,000 GAL, but an increase or decrease in this quantity will not be justification for a change in unit price.
Posted Date
Oct 31, 2025
Due Date
Feb 12, 2026
Release: Oct 31, 2025
Close: Feb 12, 2026
Supply and delivery of 2026 season's requirements of asphalt emulsion ss1h (tack). The estimated quantity required is 10,000 GAL, but an increase or decrease in this quantity will not be justification for a change in unit price.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace existing horizontal asphalt storage tank and hot oil heater.
Posted Date
Jan 17, 2026
Due Date
Jan 29, 2026
Release: Jan 17, 2026
Close: Jan 29, 2026
Replace existing horizontal asphalt storage tank and hot oil heater.
AvailableClemson University seeks a contractor to perform minor asphalt repairs (pothole repairs and minor asphalt patches) on campus roadways and parking lots. The work includes surface preparation, tack coat application, compaction, and compliance with campus requirements; the contract is described as mid-range in value with possible renewals.
Posted Date
Sep 29, 2025
Due Date
Sep 28, 2030
Release: Sep 29, 2025
Close: Sep 28, 2030
Clemson University seeks a contractor to perform minor asphalt repairs (pothole repairs and minor asphalt patches) on campus roadways and parking lots. The work includes surface preparation, tack coat application, compaction, and compliance with campus requirements; the contract is described as mid-range in value with possible renewals.
AvailableAsphalt Overlay for Pinter Lane, approx. 1 mile in length. A laid ton of hot mix applied to prepared county road, two (2) inches thick, 20 feet wide, using 12.5 mm surface per ton mix, and tack included. Asphalt mix designs containing RAP or RAS will not be accepted.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Close: Feb 10, 2026
Asphalt Overlay for Pinter Lane, approx. 1 mile in length. A laid ton of hot mix applied to prepared county road, two (2) inches thick, 20 feet wide, using 12.5 mm surface per ton mix, and tack included. Asphalt mix designs containing RAP or RAS will not be accepted.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →