Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Asbestos abatement and mold remediation at East Aurora High School and asbestos abatement Beaupre Elementary School.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes : asbestos abatement at high school, including two containments involving floor tile/mastic and pipe insulation and two mini-containments involving pipe insulation in glovebag tents.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
Work includes : asbestos abatement at high school, including two containments involving floor tile/mastic and pipe insulation and two mini-containments involving pipe insulation in glovebag tents.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal and disposal of asbestos-containing floor tile, mastic, drywall, caulking, and underfloor ducts in accordance with all federal and state rules and regulations prior to demolition.
Posted Date
Jan 20, 2026
Due Date
Feb 3, 2026
Release: Jan 20, 2026
Close: Feb 3, 2026
Work includes removal and disposal of asbestos-containing floor tile, mastic, drywall, caulking, and underfloor ducts in accordance with all federal and state rules and regulations prior to demolition.
AvailableGrand Rapids Public Schools is soliciting a contractor to perform asbestos abatement at Kent Hills Elementary School prior to scheduled renovations. The work includes removal of asbestos-containing materials in compliance with federal, state, and local regulations; a mandatory pre-bid meeting is scheduled and bidders must provide bid security equal to 5% of the base bid. The project must be completed on or before June 19, 2026, and the solicitation is open for bids.
Posted Date
Jan 22, 2026
Due Date
Feb 10, 2026
Release: Jan 22, 2026
Close: Feb 10, 2026
Grand Rapids Public Schools is soliciting a contractor to perform asbestos abatement at Kent Hills Elementary School prior to scheduled renovations. The work includes removal of asbestos-containing materials in compliance with federal, state, and local regulations; a mandatory pre-bid meeting is scheduled and bidders must provide bid security equal to 5% of the base bid. The project must be completed on or before June 19, 2026, and the solicitation is open for bids.
AvailableThe work is to remove flooring (approx. 5,500 SF) utilizing non-friable removal methods and post abatement grinding.
Posted Date
Jan 28, 2026
Due Date
Feb 5, 2026
Release: Jan 28, 2026
Close: Feb 5, 2026
The work is to remove flooring (approx. 5,500 SF) utilizing non-friable removal methods and post abatement grinding.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →