Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeks sealed bids for "As Needed Various Underground Construction Cable/Fiber" to be provided on a non-exclusive, as needed basis.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Shrewsbury is soliciting bids for underground cable and fiber work including excavation, installation, maintenance, and repairs of duct, conduit, cable, and related utility infrastructure. Contractors must comply with prevailing wage requirements, OSHA and safety regulations, be dig-safe, mobilize within 7 days of assignment, and provide all necessary equipment and materials. The estimated budget range is $100,000–$500,000 and the contact is Jim Zocco, Purchaser.
Posted Date
Jan 28, 2026
Due Date
Feb 19, 2026
Release: Jan 28, 2026
Close: Feb 19, 2026
The Town of Shrewsbury is soliciting bids for underground cable and fiber work including excavation, installation, maintenance, and repairs of duct, conduit, cable, and related utility infrastructure. Contractors must comply with prevailing wage requirements, OSHA and safety regulations, be dig-safe, mobilize within 7 days of assignment, and provide all necessary equipment and materials. The estimated budget range is $100,000–$500,000 and the contact is Jim Zocco, Purchaser.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase and pick up various sizes, types and grades of construction lumber as needed. Vendor must carry a full stock of various lumber types and maintain an active inventory. See attached file for full scope.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
Close: Feb 9, 2026
Purchase and pick up various sizes, types and grades of construction lumber as needed. Vendor must carry a full stock of various lumber types and maintain an active inventory. See attached file for full scope.
AvailableOM5 high speed fiber optic cable installation.
Posted Date
Jan 27, 2026
Due Date
Feb 10, 2026
Release: Jan 27, 2026
Close: Feb 10, 2026
OM5 high speed fiber optic cable installation.
AvailableGroup 1 consists of items 1 through 10 and shall be cable, aluminum, underground, 600-volts, with cross-linked polyethylene 90c-rated insulation.
Posted Date
Dec 30, 2025
Due Date
Feb 12, 2026
Release: Dec 30, 2025
Close: Feb 12, 2026
Group 1 consists of items 1 through 10 and shall be cable, aluminum, underground, 600-volts, with cross-linked polyethylene 90c-rated insulation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →