CountyPA
Aug 10, 2026
Closes
Aug 31, 2026
2026 Centre County CL Project - 006648.0521
Work includes mowing of the existing vegetation, planting live stakes, creation of a riparian buffer, wetland planting, and seeding an upland meadow.
Description: Moapa Valley Water District is soliciting bids for construction of the Arrow Canyon #3 Drilling project (CL-2026-119), a culinary water production well intended to serve as a backup to Arrow Canyon Wells #1 and #2. The well is anticipated to be drilled to 1,000 feet below the existing ground surface and designed to produce 4,000 gpm. Plans and specifications are available after August 17, 2026 through Sunrise Engineering's plan room, and bids are to be publicly opened and read on Wednesday, September 16, 2026 at 1:00 p.m. local time.
SpecialDistrict · NV, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyPA
Aug 10, 2026
Closes
Aug 31, 2026
Work includes mowing of the existing vegetation, planting live stakes, creation of a riparian buffer, wetland planting, and seeding an upland meadow.
CountyWI
Jan 25, 2024
Closes
Aug 31, 2026
Drilling and blasting over the course of 2026.
CityIL
Jul 23, 2026
Closes
Sep 10, 2026
The construction of one deep production well with an anticipated 24"outer diameter with a 17" inner diameter, 1,600 LF deep, and capable of pumping 700 GAL per minute.
Oglala Sioux Parks & Recreation Authority
Special DistrictSD
Aug 5, 2026
Closes
Sep 4, 2026
Drilling and installation of an electric water well system. Estimated well depth of approximately 400 feet; Electrical wiring, pump cable, and connections;
Procurement and program contacts connected to Moapa Valley Water District.