City of Springfield
Curb and gutter, pavement widening, asphalt overlay, storm water conveyance and sidewalk work.
City of Lakewood
Project consist of approx 14,896 CY of excavation; 700 TON of Hot Mix Asphalt; 380 SY of 6" Concrete Pavement; 2,800 LBS of Reinforcing Steel (epoxy Coated); 896 LF of 18" Reinforced Concrete Pipe (complete in Place); 1,952 SY of 6" Concrete Sidewalk; 1,168 LF of Curb and Gutter Type 2 (SECTION II-B). See outside link.
City of Marion
Work inckudes 898 LF of 36" RCP stormwater pipe, 5 new catch basins, remove 6 catch basins & 875 LF of pipe.
County of Kern
Work consists of constructing concrete curb and gutter, sidewalk, curb ramps, cross drains, driveways, drive approaches, paving hot mix asphalt, adjusting frame and cover to grade, and installing roadside signs, relocating mailboxes and roadside signs, reconstructing fences and gates, installing flashing beacon, street light, pull boxes and painting traffic stripes and thermoplastic pavement markings.
City of Kent
Improve sidewalks and roadways including storm drainage, illumination, flashing beacon, and other utility work includes 130 LF saw cut existing cement concrete pavement, 105 LF ductile iron storm sewer pipe 12" diameter class 50 unlined, 60 tons crushed surfacing top course 5/8" minus, 840 LF supply and install 4" diameter schedule 80 PVC conduit.
Release
Oct 08, 2024
Close
Oct 29, 2024