Work includes: 649 CY, excavation, without classification (for pipe); 274 LF, 8-IN solid HDPE pipe; 911 LF, 8-IN perforated HDPE pipe; 525 lf, 12-IN solid HDPE pipe; 403 LF, 12-IN perforated HDPE pipe; 436 LF, 12-IN perforated PP pipe; 215 LF, 8-IN solid PVC pipe; 1,791 LF, concrete curb; 145 SY, concrete driveway paving, 8-IN depth; 138 SY, turfgrass seeding; 307 CY, stormwater soil; 275 LF, landscape fencing - 3 rail split rail; 1,157 SY, superpave 64-22 PG, type A, (1-1/2 inch binder course and 1-1/2 inch wearing course; 18 EA, construction and as-built of 6" thick ADA ramps; 1 LS, new pavement markings and signage; 18 EA, construction and as-built of 6" thick ADA ramps. See attached files.