Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: replacement of lighting at various metering stations, digester feed pumps, North barscreen racks, and re-coating or replacing North Grit washers; performing roof repairs or replacement; procuring and installing new inspection hatches on digester roofs; replacing approximately 40 FRP doors and frames; installing NSEC polymer dosing stations; replacing the North Security Gate digital sign; recoating fittings on BDSF centrate lines; repairing or removing broken p-traps at NPRI PS 3 and the Digester Gas Room; installing an isolation valve for the NPRI PS 3 scum system; evaluating the RWHTF unleaded gasoline storage tank and performing necessary remediation; installing reverse ratchets on all existing NTP vertical turbine pumps; replacing two HVAC pumps for the NTP chiller condenser system; replacing the NTP Headworks influent grinder; repairing small-diameter piping in the NTP South Odor system; replacing the NTP GVT drive; replacing the NTP PLC (programming by others); replacing aeration diffuser membranes in NTP Bioreactor 1; and completing miscellaneous HVAC upgrades including controls, AHUs, exhaust fans, piping, and VAV controller replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Union City is requesting proposals for mechanical engineering design services for the Mark Green Sports Center AHU Replacement Project, including design for new air conditioning units, associated mechanical, electrical, controls, and structural elements, and construction support.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
The City of Union City is requesting proposals for mechanical engineering design services for the Mark Green Sports Center AHU Replacement Project, including design for new air conditioning units, associated mechanical, electrical, controls, and structural elements, and construction support.
AvailableMechanical upgrades and controls replacement.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Mechanical upgrades and controls replacement.
AvailableThe Project consists of the construction of replacement of the existing mechanical equipment, air handler, and boilers in the mechanical mezzanine in the weight room.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
The Project consists of the construction of replacement of the existing mechanical equipment, air handler, and boilers in the mechanical mezzanine in the weight room.
AvailableCivil annual construction services.
Posted Date
Dec 12, 2025
Due Date
Feb 17, 2026
Release: Dec 12, 2025
Close: Feb 17, 2026
Civil annual construction services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis