City Of Campbell
The scope of work generally includes, but is not limited to the following: sawcutting of Portland Cement Concrete (PCC) and asphalt concrete (AC); removal and installation of concrete sidewalk, curb ramps, and curb and gutter, conform paving; restoration of striping; and associated traffic control including temporary signing and striping.
Release
Sep 27, 2024
Close
Oct 09, 2024