Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of approx. 300 VF of landfill gas extraction wells with approx. 3,300 LF of HDPE landfill gas vacuum, compressed air, and condensate forcemain piping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes construction staking/system layout/surveying prior to construction; installing below grade polyvinyl chloride (pvc) and high-density polyethylene (HDPEpe) landfill gas (lfg) extraction wells; installing below grade HDPE horizontal collectors and rock targets on existing and proposed horizontal collectors; installing below grade HDPE lfg laterals and header, air supply line, and liquid conveyance line; installing gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances; installing new pumps, including tubing, clamps, and related appurtenances; installing new litter fence and repairing existing litter fence; installing stationary and portable odor control system; lfg well abandonments; connection of the gas collection and control system (gccs) expansion to the existing gccs; system start-up and testing.
Posted Date
Jan 12, 2026
Due Date
Feb 20, 2026
Release: Jan 12, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 20, 2026
Work includes construction staking/system layout/surveying prior to construction; installing below grade polyvinyl chloride (pvc) and high-density polyethylene (HDPEpe) landfill gas (lfg) extraction wells; installing below grade HDPE horizontal collectors and rock targets on existing and proposed horizontal collectors; installing below grade HDPE lfg laterals and header, air supply line, and liquid conveyance line; installing gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances; installing new pumps, including tubing, clamps, and related appurtenances; installing new litter fence and repairing existing litter fence; installing stationary and portable odor control system; lfg well abandonments; connection of the gas collection and control system (gccs) expansion to the existing gccs; system start-up and testing.
AvailableRowan County is soliciting developers to finance, design, permit, construct, own, operate and manage landfill gas collection, handling and processing or direct-use systems to convert landfill gas from the Rowan County Landfill into revenue-generating energy or other beneficial products.
Posted Date
Nov 23, 2025
Due Date
Feb 25, 2026
Release: Nov 23, 2025
Close: Feb 25, 2026
Rowan County is soliciting developers to finance, design, permit, construct, own, operate and manage landfill gas collection, handling and processing or direct-use systems to convert landfill gas from the Rowan County Landfill into revenue-generating energy or other beneficial products.
AvailableProvide cell 1re landfill expansion. Project includes the following work: general construction of a new 3.0-acre landfill cell including leachate collection system, pump station (including providing electrical service), hdpe piping, stormwater management practices, and related work. The new landfill is adjacent to an existing closed cell and requires the excavation and relocation of municipal solid waste from the existing closed cell to an operating landfill cell on-site. See outside link.
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
Provide cell 1re landfill expansion. Project includes the following work: general construction of a new 3.0-acre landfill cell including leachate collection system, pump station (including providing electrical service), hdpe piping, stormwater management practices, and related work. The new landfill is adjacent to an existing closed cell and requires the excavation and relocation of municipal solid waste from the existing closed cell to an operating landfill cell on-site. See outside link.
AvailableLandfill gas beneficial reuse.
Posted Date
Nov 26, 2025
Due Date
Feb 17, 2026
Release: Nov 26, 2025
Close: Feb 17, 2026
Landfill gas beneficial reuse.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →