Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
UC Berkeley solicits lump-sum bids for tenant-improvement construction to deliver a 'warm shell' retail space (Anchor House E1) including power, lighting, ventilation, restroom and adjacent storage build-out in Berkeley, CA. Estimated construction cost ~$750,000. Key requirements: California 'B' General Contractor license, mandatory pre-bid site tour, DIR registration and prevailing wage compliance, and submission of 3–5 comparable Bay Area projects (≥ $575,000) from the past 5 years. Bids must be submitted via BuildingConnected.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Tenant improvement to create a warm shell with power, lighting, ventilation and restroom for an as-yet undetermined tenant; project also includes build out of storage spaces adjacent to the space, including framing, lighting, power, and basic fire-life safety.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Tenant improvement to create a warm shell with power, lighting, ventilation and restroom for an as-yet undetermined tenant; project also includes build out of storage spaces adjacent to the space, including framing, lighting, power, and basic fire-life safety.
AvailableFire station tenant improvement.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Fire station tenant improvement.
AvailableChemeketa Community College solicits construction services for the YVC Building 2 tenant improvement/classroom remodel (estimated $1,000,000). Scope: provide construction materials and services per solicitation documents. Key procurement points: electronic bids only via email to rosemary@randcmanagement.com, mandatory on-site pre-bid conference, public-works contract subject to Oregon prevailing wage rates, no prequalification or bid bond required, and First-Tier Subcontractor Disclosure Forms must be submitted with the bid or within 2 working hours after bid closing.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Chemeketa Community College solicits construction services for the YVC Building 2 tenant improvement/classroom remodel (estimated $1,000,000). Scope: provide construction materials and services per solicitation documents. Key procurement points: electronic bids only via email to rosemary@randcmanagement.com, mandatory on-site pre-bid conference, public-works contract subject to Oregon prevailing wage rates, no prequalification or bid bond required, and First-Tier Subcontractor Disclosure Forms must be submitted with the bid or within 2 working hours after bid closing.
Multi-phased TI project at middle school. Base bid: selective demolition as outlined in drawings, new roof openings, new openings in existing concrete block wall, removal of plumbing fixtures, removal of mechanical equipment and ductwork, roof replacement, removal of existing finishes, as indicated. Remodel of science classrooms and support space, remodel of library, remodel of hallways, remodel of maintenance room with new mop sink, new/relocated MDF, new staff workroom and classrooms. Associated structural, mechanical, plumbing, electrical and technology as indicated.
Posted Date
Nov 12, 2025
Due Date
Dec 15, 2025
Release: Nov 12, 2025
Close: Dec 15, 2025
Multi-phased TI project at middle school. Base bid: selective demolition as outlined in drawings, new roof openings, new openings in existing concrete block wall, removal of plumbing fixtures, removal of mechanical equipment and ductwork, roof replacement, removal of existing finishes, as indicated. Remodel of science classrooms and support space, remodel of library, remodel of hallways, remodel of maintenance room with new mop sink, new/relocated MDF, new staff workroom and classrooms. Associated structural, mechanical, plumbing, electrical and technology as indicated.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis