FederalNY
Posted
Sep 8, 2026
Sep 15, 2026
Description: Item: alignment machine; Part Number: WS-Mobile Align; Salient Characteristics: The system must operate on 110V single-phase electrical power and function on flat shop floors or in conjunction with vehicle lifts. The alignment unit must include a motorized camera beam that automatically tracks vehicle lift height adjustments. The package must contain a PC-based control unit with monitor, keyboard, and mouse; a minimum of six (6) wheel clamps fitting 12-inch to 28-inch rim diameters; a minimum of six (6) measurement target plates; two (2) turn tables rated for a minimum capacity of 15,000 lbs each with matching drive-on ramps; turn table locking pins; a steering wheel lock; a brake pedal depressor; and two (2) wheel chocks.
Federal · NY, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from W6QM Micc-Ft DRUM.
Adjacent opportunities open for bidding right now.
FederalNY
Posted
Sep 8, 2026
Sep 15, 2026
Radio equipment, 2 Ea Transmitter Shure ADTQ Axient Digital PSM Wireless Quad Transmitter - G57 Band (470-608MHz). MFR#: ADTQUS=-G57, 8 Ea Receiver, Shure ADXR Axient Digital PSM Wireless Bodypack Receiver - A Band (470-636MHz). MFR#: ADXR=-A. Part Number: ADXR=-A, 1 Ea Remote Control, 1 Ea Audio Monitor Part Number: AD600US, 1 Ea Antenna Combiner, Part Number: AD8CUS
FederalNY
Posted
Sep 3, 2026
Sep 10, 2026
Provide physical fitness equipment. (Multi-Gym, Treadmill, Elliptical, Recumbent Bike, Dumbbell Set w/ Rack, Curl Bar Set w/ Rack). Item: Multi-Station Gym Brand Name: Hoist Fitness Part Number: H-4400B-MB, 6 EA. Item: Treadmill Brand Name: Promaxima Part Number: CV-GT5, 12 EA. See attached file.
Posted
Sep 3, 2026
Sep 18, 2026
Repair of NSN 7RH 1680 015241641, QTY 46 EA.
Posted
Aug 31, 2026
Sep 10, 2026
The contractor shall furnish all labor, materials, equipment, tools, and travel required for the installation and replacement of existing rtls components. The contractor must adhere to oem standards and ensure authorized access to centrak software and related tools is maintained. Project completion will be defined by successful installation, configuration, validation, documentation, and operational readiness of all components. See attached file.